One of the two existing monuments on site. Needed to keep the concrete footing and structure.
Designed a cap that would straddle the concrete structure.
boxes of letters, black P95
Concrete sanded and painted the new color and newly fabricated cap on top.
Existing retail monument was falling apart and rusted beyond repair. So I designed all new double sided monument.
McFadden Center
Published:

McFadden Center

Taking existing monuments and re-designing them, using existing base.

Published:

Creative Fields